Re: [PHOTOS] Archer Ave. Subway Connection Construction (Jamaica el) (1496180) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: [PHOTOS] Archer Ave. Subway Connection Construction (Jamaica el) |
|
Posted by FarRock on Sun Dec 16 20:31:20 2018, in response to Re: [PHOTOS] Archer Ave. Subway Connection Construction (Jamaica el), posted by randyo on Thu Dec 13 18:12:47 2018. With the diamond provision in the back there had to be some type of idea. Can't have a crossover planned without at least another 600 feet of tunnel planned |