Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Tuscarora Almanac for June 8

Posted by Elkeeper on Tue Jun 12 21:01:02 2018, in response to Re: Tuscarora Almanac for June 8, posted by Fisk Ave Jim on Tue Jun 12 15:37:30 2018.

The original connector proposal had the subway trains turning into the old Grant Ave station. That would have meant that the structures just east and west of Grant would have to have been rebuilt, along with the station, itself. The current portal and tracks bypassed the elevated Grant Ave structures and connected into the Dual Contracts extension, above Liberty Ave. Since the current connector crosses several blocks diagonally, more buildings had to be condemned. As you might have expected, this new route met with a lot of opposition, at the time.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]