Re: THE L TRAIN SHUTDOWN SOLUTION THAT WORKS (1465559) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: THE L TRAIN SHUTDOWN SOLUTION THAT WORKS |
|
Posted by jabrams on Tue Feb 13 18:23:52 2018, in response to Re: THE L TRAIN SHUTDOWN SOLUTION THAT WORKS, posted by Broadway Lion on Tue Feb 13 16:18:21 2018. As I have said money times, put the switches close to Lafayette on the A/C and Fulton on the G when the two lines are in the 6 track tunnel and adjacent to each other. Yes it would be an at-grade crossing. One switch from the E/B A connecting to the W/B C then the E/B G and then the W/B G. |
![]() |
![]() |
![]() |