Re: THE L TRAIN SHUTDOWN SOLUTION THAT WORKS

Posted by Broadway Lion on Tue Feb 13 16:18:21 2018, in response to Re: THE L TRAIN SHUTDOWN SOLUTION THAT WORKS, posted by MainR3664 on Tue Feb 13 15:13:32 2018.

It would take more time to install those switches than to rebuild the (LL) tunnel.

This is because of the grade differences. At either end of the H-S platform the (GG) has to duck under the (A) (CC).

The (GG) has direct access from H-S to Upper Bergen.
The (F) train has direct access from Jay to Bergen-LL.
There is a by-pass where the (F) must divert, go up a ramp and then merge back to the (GG) at Bergen-UL.

ROAR