Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1465195) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by Henry R32 #3730 on Sun Feb 11 08:49:31 2018, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by AEM-7AC #901 on Sun Feb 11 01:05:03 2018. I was thinking more the interior layout. That hallway between the two halves is also annoying... |
(There are no responses to this message.)