Re: G Train Loop (1440569) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: G Train Loop |
|
Posted by LuchAAA on Sat Jun 24 02:27:58 2017, in response to Re: G Train Loop, posted by Bill from Maspeth on Fri Jun 23 23:18:48 2017. The switchmen at CTL also put in trains and layup trains downstairs, Jamaica Yard and D4 Kew and Parsons.All things most of the road crews already do. Many times with a late railroad the switchman is needed to relay so the crew can take a comfort as the same train they came in with, they have to take back south. They probably double-end it and ask to be picked up. And if the road is as bad as you say("many times"), I think it would be better to eliminate the switching jobs and put the money on the road with longer breaks between trips. |