Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Connecting the Canarsie Line to the SAS

Posted by Wallyhorse on Tue Feb 16 01:25:33 2016, in response to Re: Why Not Construct a 3rd Tube Between Now & 2018??..Re: One proposed alternative service for L riders, posted by Wallyhorse on Sun Feb 14 23:39:51 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Adding to what I wrote earlier:

If you did the routing I suggested for a third tunnel and a rebuild of the other tunnels that allowed for a connection to the SAS at 23rd/2nd, what I would do is probably set it up so there is a stop on this line (probably given the (K) designation) at 1st Avenue/18th Street, right in the heart of Peter Cooper Village in Stuyvesant Town. This could then run via with the (T), possibly with 55th/2nd being made into a three-track station where this (K) can terminate in Phase 3 of the SAS (and also where a branch of the Broadway-Brooklyn line should that ever be connected to the SAS).

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]