Re: Canarsie Line During (L) Tunnel Shutdown/Atlantic Avenue (L) station (1385081) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Canarsie Line During (L) Tunnel Shutdown/Atlantic Avenue (L) station |
|
Posted by Wallyhorse on Wed Feb 10 07:12:04 2016, in response to Re: Canarsie Line During (L) Tunnel Shutdown/Atlantic Avenue (L) station, posted by 3-9 on Tue Feb 9 16:43:02 2016. Agreed, but this would be a perfect excuse to re-build the tracks at Atlantic Avenue and the structure is still there from the old days.Such would allow for more long-term operational flexibility and allow for such a Broadway-Brooklyn line to Canarsie to continue even after the (L) tunnel shut down ended while the (L) can better serve the much more heavily traveled portion of the line. |