Re: Expanding Eastern Division Platforms to 600 Feet |
|
|
Posted by GP38/R42 Chris on Mon Jan 30 07:35:16 2012, in response to Re: Expanding Eastern Division Platforms to 600 Feet, posted by Elkeeper on Sun Jan 29 21:12:24 2012. He's not talking about the lenthening (which is totally doable), he's talking about this idea to get rid of the grade crossing. He's right, Broadway is not wide enough to have two tracks diverging out from the existing three tracks. There's barely enough room for the three present tracks, much less having two diverging 4th and 5th trackways diverging out for a portion before realigning above the existing tracks. Perhaps in the 1980's when half the buildings there were abandoned, but now that most are occupied again, it would be a lot harder to take over property there. |