Re: CBTC installation begins on the Flushing Line (1107390) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: CBTC installation begins on the Flushing Line |
|
Posted by Wallyhorse on Tue Oct 4 15:20:04 2011, in response to Re: CBTC installation begins on the Flushing Line, posted by Railman718 on Tue Oct 4 10:53:51 2011. If they have to re-do the L at some point:I would do it where the unused tracks at Atlantic Avenue are re-activated and re-built so they can be used for CBTC, while at the same time also extend all the stations so they can handle 10-car trains as well as set it up so the flyover can be used to have a Rockaway Parkway branch trains be able to use the Broadway Brooklyn line to Manhattan. This would allow the L to potentially terminate at Atlantic Avenue so it can better serve the more heavily used portion of that line with an easy transfer between the L and the Rockaway Branch for those looking for one (via Broadway Brooklyn) or the other. |
(There are no responses to this message.)