Re: CBTC installation begins on the Flushing Line (1107296) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: CBTC installation begins on the Flushing Line |
|
Posted by Stephen Bauman on Mon Oct 3 23:37:19 2011, in response to Re: CBTC installation begins on the Flushing Line, posted by N6 Limited on Mon Oct 3 12:44:04 2011. CBTC does not handle switching. They need track circuits, integrated with CBTC to handle switching. They also need track circuits to detect broken rails. |