Re: R-32 on the A (1051734) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: R-32 on the A |
|
Posted by Joe V on Sat Apr 2 10:33:41 2011, in response to Re: R-32 on the A, posted by Train Dude on Fri Apr 1 19:20:54 2011. Would 18 R46 consists cover the entire C service ?That means more equipment is required if full-length C's are to run. If R32's accelerate better than R46's, then Lefferts trains will catch up to Far Rockaway trains over the length of the run. |