Re: Push to Replace Port Authority Bus Terminal (303710) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Push to Replace Port Authority Bus Terminal |
|
Posted by NIMBYkiller on Sun Mar 22 17:39:10 2015, in response to Re: Push to Replace Port Authority Bus Terminal, posted by Joe V on Sun Mar 22 13:09:54 2015. The 7 extension still does nothing to solve the real problem. Instead of all these buses trying to squeeze into the XBL and the PABT, they'll now be trying to squeeze into Secaucus. Have you thought about how much infrastructure at Secaucus that will require? How about having to expand the ramp from exit 15X, or make a direct entrance into the bus terminal instead of the current left turn at the light into the station? Unless you build all of this bigger than the existing combination of XBL and PABT commuter sections, the end result will be the same damn problem, just on the other side of the river.New rail tunnels, new rail terminal, and refurbished PABT, and bus parking in Manhattan, that's what needs to be done. |