Home · Maps · About

Home > BusChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Push to Replace Port Authority Bus Terminal

Posted by NIMBYkiller on Sun Mar 22 17:39:10 2015, in response to Re: Push to Replace Port Authority Bus Terminal, posted by Joe V on Sun Mar 22 13:09:54 2015.

edf40wrjww2msgDetailB:detailStr
fiogf49gjkf0d
The 7 extension still does nothing to solve the real problem. Instead of all these buses trying to squeeze into the XBL and the PABT, they'll now be trying to squeeze into Secaucus. Have you thought about how much infrastructure at Secaucus that will require? How about having to expand the ramp from exit 15X, or make a direct entrance into the bus terminal instead of the current left turn at the light into the station? Unless you build all of this bigger than the existing combination of XBL and PABT commuter sections, the end result will be the same damn problem, just on the other side of the river.

New rail tunnels, new rail terminal, and refurbished PABT, and bus parking in Manhattan, that's what needs to be done.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]