| Hochul backs 125 St Extension for SAS (1646122) | |
|
|
|
| Home > SubChat | |
[ Post a New Response | Return to the Index ]
| (1646122) | |
Hochul backs 125 St Extension for SAS |
|
|
Posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026 https://gothamist.com/news/gov-hochul-demands-125th-street-subway-extension-nixing-downtown-2nd-ave-subway-plan |
|
| (1646123) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Mitch45 on Tue Jan 13 14:57:59 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. Looks like the best we can hope for is a 63rd Street - 125th Street SAS |
|
| (1646124) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Jackson Park B Train on Tue Jan 13 15:27:39 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Mitch45 on Tue Jan 13 14:57:59 2026. Of course, dreamers like me want both...otoh, the momentum is better than the insanity in the 70s. |
|
| (Sponsored) |
iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It |
| (1646125) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Spider-Pig on Tue Jan 13 15:30:50 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. She's not nixing the downtown extension, she's putting it on the back-burner.IMO, this is less useful than extending downtown because it will not serve any new stations whatsoever. |
|
| (1646131) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by TRAIN DUDE on Tue Jan 13 16:24:38 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. Of course, the first douchebag of NY will back anything thatvwill buy hervvotes. |
|
| (1646134) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Dand124 on Tue Jan 13 17:59:24 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. Vaporware. |
|
| (1646135) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Wallyhorse on Tue Jan 13 19:15:33 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. This is one thing that is needed, likely ahead of building downtown:And as said before, this needs to be done IMO where it includes a connection to the 8th Avenue line mainly for work moves but also when in an emergency or because of a GO the (A) and (D) can use such to run via the SAS to 63rd/Lex and through that being able to get back to their normal lines via 6th Avenue. Such a connection also would potentially allow a Broadway Line train to go to either 207 or the Concourse via the SAS. |
|
| (1646145) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Jackson Park B Train on Tue Jan 13 22:38:43 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Wallyhorse on Tue Jan 13 19:15:33 2026. yes. |
|
| (1646147) | |
Re: Hochul “demands” 125 St Extension for SAS at expense of serving Second Avenue |
|
|
Posted by Olog-hai on Wed Jan 14 02:35:12 2026, in response to Hochul backs 125 St Extension for SAS, posted by qveensboro_plaza on Tue Jan 13 14:12:23 2026. Fake governor should keep her gob shut. |
|
| (1646166) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Italianstallion on Wed Jan 14 15:29:47 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Spider-Pig on Tue Jan 13 15:30:50 2026. However, it does great things for connectivity between upper west side and Riverdale and the east side. |
|
| (1646167) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Mitch45 on Wed Jan 14 15:46:16 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Jackson Park B Train on Tue Jan 13 15:27:39 2026. I can't imagine the disruption when the SAS construction hit east midtown. |
|
| (1646181) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Jackson Park B Train on Wed Jan 14 23:29:48 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Mitch45 on Wed Jan 14 15:46:16 2026. yeah. but all subway construction causes upset. But when it is done... |
|
| (1646188) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by AlM on Thu Jan 15 12:24:35 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Mitch45 on Wed Jan 14 15:46:16 2026. The worst disruption will probably be at 59th and 35th, for the bridge and tunnel, respectively. Do you know what Second Avenue in midtown is like? It's not at all like 3rd through 8th Avenues. |
|
| (1646206) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Chris R16/R2730 on Fri Jan 16 10:04:34 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Mitch45 on Tue Jan 13 14:57:59 2026. Thats all that was ever going to be built. |
|
| (1646207) | |
Re: Hochul backs 125 St Extension for SAS |
|
|
Posted by Chris R16/R2730 on Fri Jan 16 10:05:41 2026, in response to Re: Hochul backs 125 St Extension for SAS, posted by Wallyhorse on Tue Jan 13 19:15:33 2026. Absolutely not. The SAS should be extended into the Bronx to replace the 3rd Ave el. |
|