question (1631513) | |
Home > SubChat |
[ Post a New Response | Return to the Index ]
(1631513) | |
question |
|
Posted by jailhousedoc on Sun Apr 21 12:47:07 2024 When will full express service on the 7 line be restored from Queensborough Plaza to Mets-Willets Point ? The work has been going on since last year and no announcements have been made, unless I missed out on it. |
|
(1631517) | |
Re: question |
|
Posted by Italianstallion on Sun Apr 21 14:36:46 2024, in response to question, posted by jailhousedoc on Sun Apr 21 12:47:07 2024. Track work is supposed to be done in June. |
|
(1631525) | |
Re: question |
|
Posted by gbs on Sun Apr 21 21:40:43 2024, in response to Re: question, posted by Italianstallion on Sun Apr 21 14:36:46 2024. Is it track work, or something being done to the 61-Woodside station? Track work by itself wouldn't have taken this long. |
|
(Sponsored) |
iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It
|
(1631547) | |
Re: question |
|
Posted by Bill from Maspeth on Mon Apr 22 12:29:00 2024, in response to question, posted by jailhousedoc on Sun Apr 21 12:47:07 2024. I believe there is structural work being done by Woodside. It is high above the street and there are stansions on LIRR property.Perhaps some engineer decided that 3 #7 trains at the same time passing over the work zone was not a good idea. Only speculation on my part. |
|
(1631569) | |
Re: question |
|
Posted by Italianstallion on Mon Apr 22 21:24:03 2024, in response to Re: question, posted by gbs on Sun Apr 21 21:40:43 2024. Both. |
|
(1631573) | |
Re: question |
|
Posted by mkeit on Mon Apr 22 22:09:11 2024, in response to Re: question, posted by Italianstallion on Mon Apr 22 21:24:03 2024. They are replacing the steel structure under the express track. |
|