Re: Canarsie Tunnel Single Track Operation (1500391) | |
Home > SubChat |
[ Post a New Response | Return to the Index ]
[1 2] |
||
Page 2 of 2 |
(1500768) | |
Re: Canarsie Tunnel Single Track Operation |
|
Posted by VictorM on Mon Jan 21 21:25:30 2019, in response to Re: Canarsie Tunnel Single Track Operation, posted by jabrams on Mon Jan 21 13:19:26 2019. R143 and R160s have all axles on all trucks powered. On R142/As the middle cars have one powered and one trailer truck. |
|
(1500777) | |
Re: Canarsie Tunnel Single Track Operation |
|
Posted by ClearAspect on Mon Jan 21 22:34:50 2019, in response to Re: Canarsie Tunnel Single Track Operation, posted by Steve B-8AVEXP on Sun Jan 20 20:37:38 2019. The reality is the current equipment does it better |
|
[1 2] |
||
Page 2 of 2 |