Home · Maps · About

Home > SubChat

[ Post a New Response | Return to the Index ]

(1446800)

view threaded

They've been working on the railroad, Part 2

Posted by Dave on Thu Aug 17 17:07:45 2017

edf40wrjww2msgDetail:detailStr
Last month the Fort Worth & Western RR hired an outside contractor to replace worn rail (dating from 1947) near my home. New rail was dropped off; holes drilled for rail bars; and segments of rail riveted together. On Tuesday the old rail was removed and new rail installed.

Red boards and derailers were installed at MP 2.9 and MP 4.0.

Flag (1 of 1)

Track was lifted to loosen spikes and the spikes and track joiners were removed by hand:

Rail lifter (1 of 1)

Spike removal #3 (1 of 1)

Track gap (1 of 1)

Spike removal #2 (1 of 1)

Rail connector (1 of 1)

Old rail and new awaiting installation:

Old and new (1 of 1)

Bridge #1 (1 of 1)

Bridge #2 (1 of 1)

Bridge #3 (1 of 1)

At this point I needed to leave. Later in the day the new rail was installed. The first train through early that evening was a seven-unit UP train pulling empty covered hoppers to Vista Sand for loading with frac sand.



Post a New Response

(1446806)

view threaded

Re: They've been working on the railroad, Part 2

Posted by chud1 on Thu Aug 17 18:14:00 2017, in response to They've been working on the railroad, Part 2, posted by Dave on Thu Aug 17 17:07:45 2017.

edf40wrjww2msgDetail:detailStr
5 drooling stars out of 5 drooling stars for da pictures.
chud1.
:).....

Post a New Response

(1446808)

view threaded

Re: They've been working on the railroad, Part 2

Posted by kp5308 on Thu Aug 17 18:28:54 2017, in response to They've been working on the railroad, Part 2, posted by Dave on Thu Aug 17 17:07:45 2017.

edf40wrjww2msgDetail:detailStr
Good work Dave :0)



Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1446822)

view threaded

Re: They've been working on the railroad, Part 2

Posted by Dave on Thu Aug 17 20:48:15 2017, in response to Re: They've been working on the railroad, Part 2, posted by chud1 on Thu Aug 17 18:14:00 2017.

edf40wrjww2msgDetail:detailStr
Thanks!

Post a New Response

(1446823)

view threaded

Re: They've been working on the railroad, Part 2

Posted by Dave on Thu Aug 17 20:48:25 2017, in response to Re: They've been working on the railroad, Part 2, posted by kp5308 on Thu Aug 17 18:28:54 2017.

edf40wrjww2msgDetail:detailStr
Thank you!

Post a New Response

(1446829)

view threaded

Re: They've been working on the railroad, Part 2

Posted by Fisk Ave Jim on Thu Aug 17 22:55:02 2017, in response to They've been working on the railroad, Part 2, posted by Dave on Thu Aug 17 17:07:45 2017.

edf40wrjww2msgDetail:detailStr
Nice shots Dave. Keep 'em comming!

Post a New Response

(1446839)

view threaded

Re: They've been working on the railroad, Part 2

Posted by Dave on Fri Aug 18 06:56:51 2017, in response to Re: They've been working on the railroad, Part 2, posted by Fisk Ave Jim on Thu Aug 17 22:55:02 2017.

edf40wrjww2msgDetail:detailStr
Thanks, Jim!

Post a New Response

(1446847)

view threaded

Re: They've been working on the railroad, Part 2

Posted by chud1 on Fri Aug 18 07:57:49 2017, in response to Re: They've been working on the railroad, Part 2, posted by Dave on Thu Aug 17 20:48:15 2017.

edf40wrjww2msgDetail:detailStr
ur welcome Dave.
chud1.
:).....

Post a New Response


[ Return to the Message Index ]