(1405970)

view threaded

Re: SAS opening date

Posted by terRAPIN station on Mon Aug 22 12:49:08 2016, in response to Re: SAS opening date, posted by AlM on Mon Aug 22 09:35:36 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It makes sense more "easily" (i.e. out of the context of this subthread) if it were spoken before Donald Trump got the nomination. But in the context of this subthread, it makes sense even now.

Post a New Response

(1405971)

view threaded

Re: SAS opening date

Posted by terRAPIN station on Mon Aug 22 12:50:59 2016, in response to Re: SAS opening date, posted by Union Tpke on Mon Aug 22 08:19:35 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d


I know, but that is not what he said.
No, he meant what he said and it makes sense. You don't understand what he was saying. He was saying that the SAS will be opening up very soon, so thus he used an event that has already happened that many people would have thought to have been very unlikely before it actually came true.

Post a New Response

(1405973)

view threaded

Re: SAS opening date

Posted by AlM on Mon Aug 22 13:02:37 2016, in response to Re: SAS opening date, posted by terRAPIN station on Mon Aug 22 12:50:59 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
But he said so in a very indirect way which is beyond the capabilities of some people here.

He was very indirectly saying "The predictions that the SAS will never open are just as reliable as the predictions that Trump will never win the Republican nomination."


Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1405976)

view threaded

Re: SAS opening date

Posted by randyo on Mon Aug 22 13:23:31 2016, in response to Re: SAS opening date, posted by Spider-Pig on Sun Aug 21 21:43:43 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It would work N/B but not S/B since there is no way to get 8 Av trains to the MannyB.

Post a New Response

(1405978)

view threaded

Re: SAS opening date

Posted by TerrApin Station on Mon Aug 22 13:29:26 2016, in response to Re: SAS opening date, posted by AlM on Mon Aug 22 13:02:37 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yes, absolutely. I just said it in a way that was hopefully slightly less condescending.

Post a New Response

(1405985)

view threaded

Re: SAS opening date

Posted by Spider-Pig on Mon Aug 22 13:52:01 2016, in response to Re: SAS opening date, posted by terRAPIN station on Mon Aug 22 12:49:08 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It makes sense because Peter's post was based on decades of posts which claimed that the SAS will only open in some impossibly future date. This is now obviously obsolete, as most people who are now alive will still be alive when the SAS actually opens.

The comparison to the Trump nomination is that just as the SAS opening during one's lifetime was at some point taken to be unrealistic, but now is completely realistic, so Donald Trump winning the Republican nomination, which was once laughable to anyone is now actual fact. The difference is that the Trump nomination has already happened and the SAS opening is in the future, but it's still in the inevitable near-future.

Post a New Response

(1405986)

view threaded

Re: SAS opening date

Posted by Spider-Pig on Mon Aug 22 13:54:53 2016, in response to Re: SAS opening date, posted by AlM on Mon Aug 22 13:02:37 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
And predictions that the SAS will never open are now ridiculously obsolete. They were humorous before, given the failure to open it after many decades, even after construction actually started, but now it doesn't make any sense whatsoever.

Post a New Response

(1405994)

view threaded

Re: SAS opening date

Posted by terRAPIN station on Mon Aug 22 14:19:34 2016, in response to Re: SAS opening date, posted by Spider-Pig on Mon Aug 22 13:52:01 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yes, exactly.

Post a New Response

(1405995)

view threaded

Re: SAS opening date

Posted by terRAPIN station on Mon Aug 22 14:19:50 2016, in response to Re: SAS opening date, posted by Spider-Pig on Mon Aug 22 13:54:53 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
+656

Post a New Response

(1405996)

view threaded

Re: SAS opening date

Posted by AlM on Mon Aug 22 14:20:48 2016, in response to Re: SAS opening date, posted by Spider-Pig on Mon Aug 22 13:54:53 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I assume Peter was making fun of his past posts on the topic.

He's stopped saying that the WTC will never be rebuilt. :)


Post a New Response

(1406004)

view threaded

Re: SAS opening date

Posted by italianstallion on Mon Aug 22 16:24:27 2016, in response to Re: SAS opening date, posted by Peter Rosa on Sun Aug 21 21:42:12 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
That's just stupid.

Post a New Response

(1406005)

view threaded

Re: SAS opening date

Posted by AlM on Mon Aug 22 16:32:20 2016, in response to Re: SAS opening date, posted by italianstallion on Mon Aug 22 16:24:27 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I can only assume he's making fun of his past posts.


Post a New Response

(1406006)

view threaded

Re: SAS opening date

Posted by italianstallion on Mon Aug 22 16:42:49 2016, in response to Re: SAS opening date, posted by AlM on Mon Aug 22 16:32:20 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Ahh.

Post a New Response

(1406008)

view threaded

Re: SAS opening date

Posted by Eric B on Mon Aug 22 17:27:10 2016, in response to Re: SAS opening date, posted by fdtutf on Tue Aug 16 16:39:48 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
One of the other alternatives:

"Comprehensive reconfiguration of Broadway BMT (NQR and possibly W) services, including reconfiguration of Broadway express and local services, potential swapping of N and R terminals in Queens, implementation of route variants and/or changes in route designations. Compared to the proposed service plan, these alternatives would result in net travel time increases for passengers and service plans that would be more difficult to communicate."

Never knew about this one. Wonder what the details and rationale for this would be.

Post a New Response

(1406010)

view threaded

Re: SAS opening date

Posted by Joe V on Mon Aug 22 17:40:34 2016, in response to Re: SAS opening date, posted by Steve B-8AVEXP on Sun Aug 21 20:14:23 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It likely never will.

Post a New Response

(1406011)

view threaded

Re: SAS opening date

Posted by randyo on Mon Aug 22 17:42:38 2016, in response to Re: SAS opening date, posted by Spider-Pig on Mon Aug 22 13:54:53 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
However, although a small portion of the SAS will be opening it is only a faint shadow of the full SAS that was envisioned when the IND was planned with its extensions into the Bronx and Bkln. It is even a shadow of a full SAS that should be running the entire length of 2 Ave from Harlem to the S/E of Manhattan.

Post a New Response

(1406017)

view threaded

Re: SAS opening date

Posted by Joe V on Mon Aug 22 18:32:03 2016, in response to Re: SAS opening date, posted by Union Tpke on Mon Aug 22 06:42:13 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Canada does not have much of an open door policy as it did during the Vietnam era. Basically, you have to be sponsored or you can retire there since you bring your own money and benefits. Regardless, the only cities in Canada that have much of job market are Toronto and Vancouver.

Post a New Response

(1406020)

view threaded

Re: SAS opening date

Posted by chud1 on Mon Aug 22 18:38:29 2016, in response to Re: SAS opening date, posted by randyo on Mon Aug 22 17:42:38 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
IAWTP!
chud1.
:).....

Post a New Response

(1406023)

view threaded

Re: SAS opening date

Posted by Union Tpke on Mon Aug 22 19:22:47 2016, in response to Re: SAS opening date, posted by Joe V on Mon Aug 22 18:32:03 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I know. The way to get there is to marry a Canadian.

Post a New Response

(1406027)

view threaded

Re: SAS opening date

Posted by Elkeeper on Mon Aug 22 20:33:14 2016, in response to Re: SAS opening date, posted by Union Tpke on Mon Aug 22 19:22:47 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
As long as you don't mind paying a 42% income tax rate and the sales taxes in most provinces are about 15%, or more. Dine out and you will be paying at least 30% of your bill with taxes and gratuities!

Post a New Response

(1406038)

view threaded

Re: SAS opening date

Posted by Jackson Park B Train on Mon Aug 22 22:10:47 2016, in response to Re: SAS opening date, posted by Elkeeper on Mon Aug 22 20:33:14 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
otoh,single payer health insurance. you get whatyoupay for.

Post a New Response

(1406040)

view threaded

Re: SAS opening date

Posted by Union Tpke on Mon Aug 22 22:15:53 2016, in response to Re: SAS opening date, posted by Jackson Park B Train on Mon Aug 22 22:10:47 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It is worth the price!

Post a New Response

(1406064)

view threaded

Re: SAS opening date

Posted by MainR3664 on Tue Aug 23 08:05:26 2016, in response to Re: SAS opening date, posted by randyo on Mon Aug 22 17:42:38 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
True. But it's also a meaningful start...

Post a New Response

(1406080)

view threaded

Re: SAS opening date

Posted by Express Rider on Tue Aug 23 10:35:17 2016, in response to Re: SAS opening date, posted by randyo on Mon Aug 22 17:42:38 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Originally, there were two route choices for the SAS in the Bronx, correct?

One would have recaptured the Pelham Line (were there any kind of projected plans for there to be a direct transfer from IRT to IND, at the point where it was to be recaptured?)

Another was to build a new Bronx route south of the Pelham, also going northeast?
If this latter route had ever been built, would this have meant the suspension of service on the IRT's outer Pelham, preparatory to tearing it down?
Thanks.

Post a New Response

(1406085)

view threaded

Re: SAS opening date

Posted by Spider-Pig on Tue Aug 23 11:38:20 2016, in response to Re: SAS opening date, posted by Express Rider on Tue Aug 23 10:35:17 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I don't believe Pelham recapture was part of the 1929 plan. They proposed a line via Lafayette Avenue, south of the Pelham Line, and another one to NE Bronx via Boston Road and Morris Park Avenue, which would have connected to the eastern extension of the Concourse Line and had a branch that would have recaptured the White Plains Road Line.

Post a New Response

(1406101)

view threaded

Re: SAS opening date

Posted by italianstallion on Tue Aug 23 14:03:39 2016, in response to Re: SAS opening date, posted by Eric B on Mon Aug 22 17:27:10 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It's just mumbo-jumbo they threw in to make it seem they considered alternatives.

Post a New Response

(1406189)

view threaded

8th Avenue trains to Manhattan Bridge

Posted by Wallyhorse on Wed Aug 24 12:30:07 2016, in response to Re: SAS opening date, posted by randyo on Mon Aug 22 13:23:31 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Unless they built a track connection (railroad) north of Broadway-Lafayette on the Southbound side.

Post a New Response

(1406224)

view threaded

Re: 8th Avenue trains to Manhattan Bridge

Posted by randyo on Wed Aug 24 16:25:55 2016, in response to 8th Avenue trains to Manhattan Bridge, posted by Wallyhorse on Wed Aug 24 12:30:07 2016.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There has been talk about it but so far, no action. As per typical IND construction, there was originally a diamond Xover between the lcl and exp tks S/O Bway/Laf but it was removed when the exp tks were connected to Chrystie, For some reason the engineers designing Chrystie opted to begin the upgrade to Chrystie at the immediate south end of the station rather than south of then Xover. From what I have seen of the N/B side where BJ2 tk connects to B2 S/O the station, it seems that the upgrade could have been started S/O the Xover on the S/B side without making the upgrade too steep.

Post a New Response