Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 10:20:58 2013

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
as of last night (9pm) cleanup has started.

http://www.stamfordadvocate.com/news/article/Crews-working-to-hoist-damaged-train-from-tracks-4529053.php

Post a New Response

(1223328)

view threaded

Re: Cleanup at crash site started

Posted by Fred G on Sun May 19 10:34:07 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They should make an ad hoc HOV lane from Bridgeport to Fairfield Metro exit on I-95 and keep the buses pumping.

your pal,
Fred

Post a New Response

(1223332)

view threaded

Re: Cleanup at crash site started

Posted by Joe V on Sun May 19 10:43:25 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Which indicate to me they have a pretty good idea of what caused it, or the lawyers and engineers would still be at it.

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1223336)

view threaded

Re: Cleanup at crash site started

Posted by r33/r36 mainline on Sun May 19 10:50:39 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I hope some railfans got a video of these M8s getting towed back to the yard.

Post a New Response

(1223339)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 11:00:00 2013, in response to Re: Cleanup at crash site started, posted by Joe V on Sun May 19 10:43:25 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
earlier report of fractured rail.

Post a New Response

(1223342)

view threaded

Re: Cleanup at crash site started

Posted by Dave on Sun May 19 11:07:24 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Did the NTSB finish its investigation?

Post a New Response

(1223348)

view threaded

Re: Cleanup at crash site started

Posted by Fred G on Sun May 19 11:20:00 2013, in response to Re: Cleanup at crash site started, posted by Dave on Sun May 19 11:07:24 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I don't think they'd be pulling trains out otherwise.

your pal,
Fred

Post a New Response

(1223358)

view threaded

Re: Cleanup at crash site started

Posted by Joe V on Sun May 19 11:50:29 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 11:00:00 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Of could the derailment fracture the rail, invert cause & effect ?

Post a New Response

(1223366)

view threaded

Re: Cleanup at crash site started

Posted by Broadway Lion on Sun May 19 12:40:24 2013, in response to Re: Cleanup at crash site started, posted by Joe V on Sun May 19 10:43:25 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No. All it means is that they have collected perishable evidence from the wreck site. They will now go over the cars and adjacent infrastructure with a fine tooth comb to see what else it is that they may see. They will now examine those cars in detail and reconstruct all of the forces involved in the accident, and the sequence of events.

They have so far as I know, not ruled anything out yet. But an examination of the ground, its moisture, its stability especially with the adjacent tracks and ballast removed as it was.

LOOK under every leaf, every scrap of metal, examine how it was deformed and by what. There is a LOOONNNNG way to go on this investigation, and much of it is done in doors at the drafting table, with paper, pencil and computer.

And, Yes, the NTSB knows how vital this rail link is to the area and how important it is to have trains running again as soon as possible.

But you do need to remove the cars before you can continue to inspect the track and roadbed structure.

So go ROAR on that.

ROAR

Post a New Response

(1223367)

view threaded

Re: Cleanup at crash site started

Posted by Broadway Lion on Sun May 19 12:43:57 2013, in response to Re: Cleanup at crash site started, posted by Dave on Sun May 19 11:07:24 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No. Not by a long shot. All they did was examine perishable evidence, and make photographs of every thing within one mile.

They have begun to gather evidence, Once the cars are moved they will be back to examine the road bed very carefully.

THEN they will take all of this information back to Washington and examine it, literally for months.

Once they have reached their conclusions they will cast their report in Government Speak (another month at least)...

It is only just begun!

ROAR

Post a New Response

(1223408)

view threaded

Re: Cleanup at crash site started

Posted by SelkirkTMO on Sun May 19 14:00:33 2013, in response to Re: Cleanup at crash site started, posted by Joe V on Sun May 19 11:50:29 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Wheel marks at the joint should tell that story one way or another.

Post a New Response

(1223457)

view threaded

Re: Cleanup at crash site started

Posted by Train2104 on Sun May 19 16:06:21 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Per NTSB Twitter all cars are removed from the scene.

Post a New Response

(1223459)

view threaded

Re: Cleanup at crash site started

Posted by Train2104 on Sun May 19 16:07:12 2013, in response to Re: Cleanup at crash site started, posted by Train2104 on Sun May 19 16:06:21 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They are going to MNR BRP Yard

Post a New Response

(1223461)

view threaded

Re: Cleanup at crash site started

Posted by Train2104 on Sun May 19 16:09:02 2013, in response to Re: Cleanup at crash site started, posted by Train2104 on Sun May 19 16:06:21 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Preliminary data: Both trains were traveling at roughly 70mph at time of collision

Post a New Response

(1223477)

view threaded

Re: Cleanup at crash site started

Posted by Dave on Sun May 19 17:00:30 2013, in response to Re: Cleanup at crash site started, posted by Broadway Lion on Sun May 19 12:43:57 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
From what I read no equipment was allowed to be moved until the NTSB finished their preliminary investigation. I guess they did.

Post a New Response

(1223482)

view threaded

Re: Cleanup at crash site started

Posted by Joe on Sun May 19 17:38:20 2013, in response to Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 10:20:58 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I must ask an elementary question. On which two tracks were the trains running, as two were out of service? I don't recall how tracks are numbered along there, presumably 1 and 2 in the center and 3 and 4 on the outside, but please confirm the ordinary track numbering. In recent weeks, have the passengers been using temporary bridges to board trains at the nearby station?
Thanks.
Joe

Post a New Response

(1223485)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 17:43:28 2013, in response to Re: Cleanup at crash site started, posted by Dave on Sun May 19 17:00:30 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
All cars are gone, working on track now

Post a New Response

(1223487)

view threaded

Re: Cleanup at crash site started

Posted by Fred G on Sun May 19 17:46:23 2013, in response to Re: Cleanup at crash site started, posted by Joe on Sun May 19 17:38:20 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
2 and 4 (express and local to ny) were in service and 1 and 3 (express and local to new haven) are out. There's an interlocking east of the crash site where they can reroute.

your pal,
Fred

Post a New Response

(1223490)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 17:53:47 2013, in response to Re: Cleanup at crash site started, posted by Joe on Sun May 19 17:38:20 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
east bound track is 4, eastbound express is 2
westbound track is 3, westbound express track is 1

3 and 1 are out of service for viaduct construction and catenary

trains were on tracks 4 and 2

yes there are bridge plates at Fairfield Metro and at Fairfield, Greens farms.

Post a New Response

(1223491)

view threaded

Re: Cleanup at crash site started

Posted by TransitChuckG on Sun May 19 17:55:04 2013, in response to Re: Cleanup at crash site started, posted by Dave on Sun May 19 11:07:24 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Are they still going with the original assumption or findings, the bad rail thing?

Post a New Response

(1223495)

view threaded

Re: Cleanup at crash site started

Posted by Fred G on Sun May 19 18:03:07 2013, in response to Re: Cleanup at crash site started, posted by TransitChuckG on Sun May 19 17:55:04 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They haven't said yet.

your pal,
Fred

Post a New Response

(1223501)

view threaded

Re: Cleanup at crash site started

Posted by Train Man Paul : Metro-North's Best Conductor FOR ALL 3 LINES!!! on Sun May 19 18:26:29 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 17:43:28 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Since there is a wreck repair shop, albeit a small one, in Stamford, I wonder if any of the cars went there? I'll know tomorrow (pic ops??)

Post a New Response

(1223502)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 18:33:24 2013, in response to Re: Cleanup at crash site started, posted by Train Man Paul : Metro-North's Best Conductor FOR ALL 3 LINES!!! on Sun May 19 18:26:29 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Cars went to Bridgeport for further NTSB investigations

Post a New Response

(1223503)

view threaded

Re: Cleanup at crash site started

Posted by Train Man Paul : Metro-North's Best Conductor FOR ALL 3 LINES!!! on Sun May 19 18:44:03 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 18:33:24 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Guess there's plenty of room there for them to do their investigations.

Post a New Response

(1223506)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 18:48:03 2013, in response to Re: Cleanup at crash site started, posted by Train Man Paul : Metro-North's Best Conductor FOR ALL 3 LINES!!! on Sun May 19 18:44:03 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
yup and with power off, they got from 0730 till 1830 without disturbing anyone.

Post a New Response

(1223537)

view threaded

Re: Cleanup at crash site started

Posted by Newkirk Images on Sun May 19 20:20:44 2013, in response to Re: Cleanup at crash site started, posted by r33/r36 mainline on Sun May 19 10:50:39 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I hope some railfans got a video of these M8s getting towed back to the yard.

I saw the video on Ch.4 news tonight. The cars look worse for wear, now that they are separated. I don't think the cars with the worse damage can be repaired.

Unless they can remove an entire side of the car body and replace it with a new side. But will it be worth it cost and labor wise ?

Bill Newkirk

Post a New Response

(1223538)

view threaded

Re: Cleanup at crash site started

Posted by Newkirk Images on Sun May 19 20:23:17 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 17:43:28 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
All cars are gone, working on track now

How long did it take to tow the cars back to New Haven at a slow restricted speed ?

Bill Newkirk



Post a New Response

(1223540)

view threaded

Re: Cleanup at crash site started

Posted by Broadway Lion on Sun May 19 20:38:20 2013, in response to Re: Cleanup at crash site started, posted by Fred G on Sun May 19 17:46:23 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I did an overhead view of all of the tracks between Bridgeport and Fairfield and saw no switches. Where is this interlocking in relation to the crash site.

ROAR

Post a New Response

(1223541)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 20:38:45 2013, in response to Re: Cleanup at crash site started, posted by Newkirk Images on Sun May 19 20:23:17 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
their going to Bridgeport yard for further investigation.

Post a New Response

(1223542)

view threaded

Re: Cleanup at crash site started

Posted by Dutchrailnut on Sun May 19 20:40:34 2013, in response to Re: Cleanup at crash site started, posted by Broadway Lion on Sun May 19 20:38:20 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
at CP255 about 3 miles east or CP248 about 4 miles west of crash.

Post a New Response

(1223545)

view threaded

Re: Cleanup at crash site started

Posted by Newkirk Images on Sun May 19 20:47:00 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 20:38:45 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
their going to Bridgeport yard for further investigation.

I found out from other posters that they were being hauled to Bridgeport yard.

New Haven yard is where the rubes on Channel 4 said they were headed :o(

Bill Newkirk



Post a New Response

(1223550)

view threaded

Re: Cleanup at crash site started

Posted by FormerVanWyckBlvdUser on Sun May 19 20:56:21 2013, in response to Re: Cleanup at crash site started, posted by Newkirk Images on Sun May 19 20:47:00 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Well, some new cars most likely headed for the scrapper. :(

Post a New Response

(1223554)

view threaded

Re: Cleanup at crash site started

Posted by Broadway Lion on Sun May 19 21:05:06 2013, in response to Re: Cleanup at crash site started, posted by Dutchrailnut on Sun May 19 20:40:34 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Thank You!

I was commenting on the Trains.com forum on this and I told them that there were no switches in the area. They were thinking a picked switch.

I Googled the whole area between Fairfield and Bridgeport, not knowing the exact location of the incident from the aerials. But I assured myself of what I had said and so said it again, telling them to go look at the visuals themselves.

ROAR

Post a New Response

(1223556)

view threaded

Re: Cleanup at crash site started

Posted by Wayne-MrSlantR40 on Sun May 19 21:13:46 2013, in response to Re: Cleanup at crash site started, posted by FormerVanWyckBlvdUser on Sun May 19 20:56:21 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Both 9246 and 9247 are total losses. Perhaps replacements will be built, but those two are gone. 9193 is also likely a total loss, unless they can figure out how to fix her nose.

wayne


Post a New Response