Monday, July 2nd, 2012 @ 5 am. Signs are up in that station.

from Second Avenue Sagas tweet


Post a New Response

(1163639)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Wayne-MrSlantR40 on Tue Jun 26 23:21:42 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Does anybody know if they have finished the tile/ceramic work?

-w-

Post a New Response

(1163660)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Allan on Wed Jun 27 08:17:37 2012, in response to Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Wayne-MrSlantR40 on Tue Jun 26 23:21:42 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I passed by there (on an uptown express) yesterday. They have a long way to go before the tile work is completed.

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1163720)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Thu Jun 28 19:18:00 2012, in response to Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Allan on Wed Jun 27 08:17:37 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It looks like they started the original ends of the Bleeker station a few months back with tile but then stopped all work on it. It hasn't changed in a while.

I had noticed they were working late on the stairs/escalator in the new transfer and I figured they were getting close. There must have been some disincentive to have it go on any longer as the signs said finished by Q2.

There's still a lot of work to be done.

Post a New Response

(1163728)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by dinky on Thu Jun 28 19:58:54 2012, in response to Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by zac on Thu Jun 28 19:18:00 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It looks like they started the original ends of the Bleeker station a few months back with tile but then stopped all work on it. It hasn't changed in a while.

Within the last week or so, they've filled in a lot of tile around the blue "Bleecker Street" tablets at the north end of the downtown platform. It also looks as though they've done some more of the decorative brickwork near the entrance on that end of the platform.

Post a New Response

(1164385)

view threaded

Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Newkirk Plaza David on Mon Jul 2 07:17:52 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Nope - - as of this morning, the new transfer passage is not ready for prime time. Maybe a week or two it will finally open.

The "boarding area" overhead signs near the C/R positions are installed on the IND platforms, so it's really getting close.

Post a New Response

(1164399)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Wayne-MrSlantR40 on Mon Jul 2 09:29:48 2012, in response to Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by dinky on Thu Jun 28 19:58:54 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
What I'm interested in seeing is the finish planned for the non-original portion of the station. No tablets are present. And there doesn't look like there will be cutouts for them either. My guess is this - and it's only a guess - there are gaps at the top of the white tile where plaques or cartouches would be fitted - on both sides - and there will be "mini" versions of the big plaques with lettering "Bleecker Street" placed therein. I guess we will have to wait and see. I did like the "proto-IND" tile they had previously - nice shades of blue used.

wayne


Post a New Response

(1164400)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Dyre Dan on Mon Jul 2 09:30:40 2012, in response to Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Newkirk Plaza David on Mon Jul 2 07:17:52 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yeah, I checked it out too, too bad. But why do they need new "boarding area" signs on the IND platforms, and what connection do they have with the transfer passage to the IRT?

Post a New Response

(1164450)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Ancient Mariner on Mon Jul 2 14:33:05 2012, in response to Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Newkirk Plaza David on Mon Jul 2 07:17:52 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I don't know if this is worth banking on, but I just received the following response from MTA Customer Service in response to an inquiry I'd made:

"We have been advised that the opening date for the Broadway-Bleecker Street transfer will be August 13, 2012.

We hope this information is helpful to you."

So six weeks from today's the date (fingers crossed).


Post a New Response

(1164475)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Mon Jul 2 16:01:25 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Ancient Mariner on Mon Jul 2 14:33:05 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I didn't think it would be open today. It was still dust covered on Friday with all the equipment still in place. If they wanted to they may have been able to open the staircase, but the escalator isn't ready. I mean, really, it's only been 3 years. How fast do you think they can work?

Post a New Response

(1164488)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Ancient Mariner on Mon Jul 2 16:56:13 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by zac on Mon Jul 2 16:01:25 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yeah it took from March 24, 1900, when they broke ground at City Hall, until October October 27, 1904, to build the whole freakin' IRT. I can certainly see why tweaking one of the 28 stations that opened on that day would take nearly as long.

Post a New Response

(1174552)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by fset on Mon Aug 27 18:28:10 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Ancient Mariner on Mon Jul 2 16:56:13 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Does anyone have a new opening date? I'll bet it's delayed because of vacations before Labor Day ;)

Post a New Response

(1174607)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Mr. MTA on Mon Aug 27 20:55:35 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I'm very disappointed that it didn't open in June like it was supposed to. So many people could have benefited using it up to now. It doesn't seem like there's much else to be done.

Post a New Response

(1174699)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Chris R16/R2730 on Tue Aug 28 13:59:54 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Ancient Mariner on Mon Jul 2 16:56:13 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It's easy to do construction when you have little federal regulation to meet, the political power to quash any resistance to what you want to build and an unending supply of cheap, disposable immigrant labor.

Post a New Response

(1174711)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by italianstallion on Tue Aug 28 14:32:07 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Chris R16/R2730 on Tue Aug 28 13:59:54 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yep. Thank goodness for labor protections.

Post a New Response

(1174718)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Tue Aug 28 15:13:43 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by fset on Mon Aug 27 18:28:10 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There haven't been too many people working there the last few days. I only saw one guy today and he was painting the outside of the elevator cage yellow for visibility.

Post a New Response

(1174719)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Tue Aug 28 15:14:19 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by fset on Mon Aug 27 18:28:10 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There haven't been too many people working there the last few days. I only saw one guy today and he was painting the outside of the elevator cage yellow for visibility.

Post a New Response

(1174724)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Chris R16/R2730 on Tue Aug 28 15:25:11 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by italianstallion on Tue Aug 28 14:32:07 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Indeed. In 1904, labor unions and federal regulations were good things. It's not 1904 anymore.

Post a New Response

(1174732)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by italianstallion on Tue Aug 28 16:51:58 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Chris R16/R2730 on Tue Aug 28 15:25:11 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
And yet they are still good things.

Post a New Response

(1174827)

view threaded

Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by GIS Man on Wed Aug 29 08:34:45 2012, in response to Re: Not yet (Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by italianstallion on Tue Aug 28 16:51:58 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Unfortunately, they're still very necessary.

Bob

Post a New Response

(1175291)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Gold_12th on Sat Sep 1 23:36:49 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Last update - June 30, 2012... 79% completed for ADA transfer complex.
- http://mta.info/capitaldashboard/05_09/agencies/t/t5041302_all_data.htm

Post a New Response

(1175835)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Thu Sep 6 21:34:50 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Still not open. The escalator was running today, the elevators are running, the ads are up on the landing. The tile work is filled in. At this point I don't know what they're waiting for.

Post a New Response

(1175839)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by fset on Thu Sep 6 22:10:30 2012, in response to Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by zac on Thu Sep 6 21:34:50 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I believe that MTA will open both Bleecker Street and the Dey Street passageway (down at Fulton Transit Center) together, judging from the ads I've seen on the #5

Post a New Response

(1176784)

view threaded

(An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Gold_12TH on Thu Sep 13 20:30:53 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
from gothamist; "coming soon"


Wanna bet... contractor errors; litigation?

Post a New Response

(1176843)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Avid Reader on Fri Sep 14 11:01:41 2012, in response to (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Thu Sep 13 20:30:53 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
That's what she said!

Post a New Response

(1176848)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Fri Sep 14 11:55:43 2012, in response to (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Thu Sep 13 20:30:53 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
They even have advertising up in the unopened staircase.

I don't see many people working there anymore. It is also unclear whether Houston Street above still has sections closed off due to this construction, or something else.

The tile work at the Bleecker end is still unfinished, mostly around the curves of the wall.

Post a New Response

(1177068)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by B1bus on Sat Sep 15 19:03:05 2012, in response to (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Thu Sep 13 20:30:53 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
There was even a transfer automated announcement this past Thursday on the train.

Post a New Response

(1177186)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Kevin from Midwood on Sun Sep 16 16:31:35 2012, in response to (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Thu Sep 13 20:30:53 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
According to a Transit spokesperson.

Post a New Response

(1177188)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Gold_12th on Sun Sep 16 16:43:55 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Kevin from Midwood on Sun Sep 16 16:31:35 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
right between board meetings.

Post a New Response

(1177557)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Newkirk Plaza David on Wed Sep 19 13:47:59 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Gold_12th on Sun Sep 16 16:43:55 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
So much for coming "this summer".

Post a New Response

(1177561)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Chris R16/R2730 on Wed Sep 19 14:04:22 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Newkirk Plaza David on Wed Sep 19 13:47:59 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Missed it by 4 days.

Post a New Response

(1177578)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by italianstallion on Wed Sep 19 15:11:13 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Chris R16/R2730 on Wed Sep 19 14:04:22 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Close enough for government work. :-)

Post a New Response

(1177697)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Allan on Thu Sep 20 15:56:16 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Newkirk Plaza David on Wed Sep 19 13:47:59 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
This makes the August 2012 version of the MAP a bit of an embarrassment to the MTA (just add it to the list) since it already shows the transfer. But of course besides any of us, who is going to notice that?



Post a New Response

(1177729)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by Bill from Maspeth on Thu Sep 20 20:01:22 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Allan on Thu Sep 20 15:56:16 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
A beauracracy does not get embarassed.

People do!

Post a New Response

(1177940)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by William A. Padron on Sat Sep 22 14:30:57 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by Bill from Maspeth on Thu Sep 20 20:01:22 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
CONFIRMED!!!

The Bleecker Street/Broadway-Lafayette station transfer from the uptown #6 to to the IND 6th Avenue line (and vice versa) opens this Tuesday, September 25, 2012 at 12:00noon Eastern. The posters were going up there this morning...yeah!!! At long last, finally!

-William A. Padron
["B"]


Post a New Response

(1177963)

view threaded

Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25 NOON

Posted by Gold_12TH on Sat Sep 22 17:10:06 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d

Source: mta.info


Post a New Response

(1177965)

view threaded

(Reason for delay) Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Gold_12TH on Sat Sep 22 17:17:28 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Tue Jun 26 22:46:04 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d

Source: page 45; September board meeting

Post a New Response

(1177980)

view threaded

Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25

Posted by chud1 on Sat Sep 22 18:01:18 2012, in response to Re: (An update)... Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25, posted by William A. Padron on Sat Sep 22 14:30:57 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
its about time. excellent.
chud1

Post a New Response

(1178195)

view threaded

Re: (Reason for delay) Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by zac on Mon Sep 24 03:17:08 2012, in response to (Reason for delay) Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Sat Sep 22 17:17:28 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The curbs at Houston St just confirms what I said in my post above, it looks like the street isn't finished even though the hole was long ago filled in.

At least it will finally be open. I've been transferring there for over 10 years now, or at least when that side of the Manhattan Bridge was open.

Post a New Response

(1178196)

view threaded

Re: (Reason for delay) Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is...

Posted by Wallyhorse on Mon Sep 24 03:20:16 2012, in response to (Reason for delay) Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is..., posted by Gold_12TH on Sat Sep 22 17:17:28 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Good explanation of why the delay in opening the transfer. Obviously, they had to make sure everything was working correctly before they opened it up.

Post a New Response

(1178197)

view threaded

Re: Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25 NOON

Posted by Wallyhorse on Mon Sep 24 03:21:25 2012, in response to Opening day for Bleecker St - Broadway/Lafayette St transfer complex is 9/25 NOON, posted by Gold_12TH on Sat Sep 22 17:10:06 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Now we know (as noted in the other post) why the delays happened at least.