Home · Maps · About

Home > SubChat

[ Post a New Response | Return to the Index ]

(1147591)

view threaded

Pittsburgh's North Shore Connector is Open

Posted by Jayayess1190 on Fri Mar 30 23:02:00 2012

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d


Blue Line heads onto the el

Check out the news stories, the first train was even late.

Post a New Response

(1147593)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by Jackson Park B Train on Fri Mar 30 23:28:38 2012, in response to Pittsburgh's North Shore Connector is Open, posted by Jayayess1190 on Fri Mar 30 23:02:00 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Seems to me that there should be two doors on each side of each unit. The squealing leaving the first station is unacceptably loud.

Post a New Response

(1147608)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by chud1 on Sat Mar 31 03:47:18 2012, in response to Pittsburgh's North Shore Connector is Open, posted by Jayayess1190 on Fri Mar 30 23:02:00 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Excellent video.
chud1

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1147615)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by merrick1 on Sat Mar 31 08:13:44 2012, in response to Re: Pittsburgh's North Shore Connector is Open, posted by Jackson Park B Train on Fri Mar 30 23:28:38 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Squealing gives it the classic feel of trolley car subway like Boston's Green Line or the Newark City Subway.

Post a New Response

(1147749)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by orange blossom special on Sat Mar 31 17:14:12 2012, in response to Pittsburgh's North Shore Connector is Open, posted by Jayayess1190 on Fri Mar 30 23:02:00 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
I must be getting old. I feel so cynical everytime i see a big deal out of a 1 mile extension :(

Post a New Response

(1147763)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by Olog-hai on Sat Mar 31 18:05:38 2012, in response to Re: Pittsburgh's North Shore Connector is Open, posted by orange blossom special on Sat Mar 31 17:14:12 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
No, that's not a sign of getting old.

Post a New Response

(1147845)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by Joe V on Sat Mar 31 21:06:34 2012, in response to Re: Pittsburgh's North Shore Connector is Open, posted by orange blossom special on Sat Mar 31 17:14:12 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
It was $800M to go a whole mile.

Post a New Response

(1147847)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by Olog-hai on Sat Mar 31 21:08:33 2012, in response to Re: Pittsburgh's North Shore Connector is Open, posted by Joe V on Sat Mar 31 21:06:34 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Yup . . . that's not quite four times what was spent on the Newark Subway's extension to Broad Street (M&E) Station. (And that was supposed to be MOS-1 for the Newark-Elizabeth Rail Link . . .)

Post a New Response

(1147853)

view threaded

Re: Pittsburgh's North Shore Connector is Open

Posted by Joe V on Sat Mar 31 21:16:21 2012, in response to Re: Pittsburgh's North Shore Connector is Open, posted by Olog-hai on Sat Mar 31 21:08:33 2012.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
If it goes many miles beyond at $10M per mile, than one can amortize it, but that's not what is happening.

And they had to decapitate the Penn Station Branch to do it.

And they refused to use the abandoned lower level of the Fort Wayne (NS) Bridge.

Post a New Response


[ Return to the Message Index ]