| Re: TEAR DOWN THE SOUTH CHANNEL BRIDGE!!!!!!!! (853084) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: TEAR DOWN THE SOUTH CHANNEL BRIDGE!!!!!!!! |
|
|
Posted by G1Ravage on Fri Nov 6 05:01:38 2009, in response to Re: TEAR DOWN THE SOUTH CHANNEL BRIDGE!!!!!!!!, posted by Train Dude on Thu Nov 5 22:49:47 2009. I've been noticing it takes longer for the bridge circuits to lock once power is reconnected. |