Re: R-160 Option III Order |
|
Posted by randyo on Thu Oct 8 14:54:15 2009, in response to Re: R-160 Option III Order, posted by South Brooklyn Railway on Thu Oct 8 14:43:31 2009. The electric portions were the same with the exception of the absence of a PA circuit on the R-10s as originally built. The problem was that there was a slight delay in reaction time on the R-10 doors due to their being air operated. |
![]() |