Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Why were the B and D swapped in 2004?

Posted by zac on Tue Aug 11 17:36:33 2009, in response to Re: Why were the B and D swapped in 2004?, posted by Chris R16/R2730 on Tue Aug 11 13:33:47 2009.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
At the time of the switch I read an article, likely in the NYTimes, about the thinking. Yes, the Brighton riders preferred the Q as the full time train, after living with either Bway or 6th Ave for the prior x number of years. (I was surveyed myself.)

Then, when that routing was set, they realized they had 2 part time lines, the B from BPB to 34th, and the Q diamond from 57th to BB. So they combined them into one. That left the D to switch over to the West End as the full time line there.

This made the weekday vs. weekend patterns the same, with just the part-time B (and rush hour M) the exception. Now if they would only have the D stop at DeKalb when the B isn't running...

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]