Re: 2nd Ave Subway Setback (811679) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 2nd Ave Subway Setback |
|
Posted by trainsarefun on Wed Jul 22 12:16:30 2009, in response to Re: 2nd Ave Subway Setback, posted by Think twice on Wed Jul 22 09:13:15 2009. I worry about long term capacity. To me the express tracks we have are more valuable for the capacity they provide (for more branches to the other boroughs) than the speed they allow.Initially, we're talking about something like 3-8 tph on the stubway, depending on time of day. So that still leaves plenty of capacity left over. As it is, very little of NYCT's trackage is operated at practical capacity anyway; it's basically just the Queens Blvd express tracks D1/D3 during part of the peak period between 36 St and 71 Av. |
(There are no responses to this message.)