Re: Tunnel stubs (752660) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Tunnel stubs |
|
Posted by randyo on Thu Mar 5 17:16:17 2009, in response to Re: Tunnel stubs, posted by bigrene22 on Thu Mar 5 16:43:25 2009. Correct. At one point there was a proposal to construct a NYCT yard in an unused portion of Sunnyside Yd so that midday service returning from Manhattan would not have to go all the way back to Jamaica Ad but could lay up at the new facility. This was part of an old proposeal to have 3 tracks in the peak direction of traffic along Qns Blvd with bi directional signalling installed on both express tracks. The new yard would have been needed to reduce the number of trains operating against the peak direction of traffic since they wouldn't have to return all the way back to Jamaica Yd on the only available off peak track. |
![]() |
(There are no responses to this message.)
![]() |
![]() |