Re: June 28, 1956

Posted by Andy on Sat Jun 28 18:56:17 2008, in response to Re: June 28, 1956, posted by Steve B-8AVEXP on Sat Jun 28 16:38:12 2008.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Correct. The power problem was caused because the Westinghouse Electric Corp. was shut down by a strike in late 1955. It could not provide the substation equipment on time. So the TA made contingency plans to limit the power usage on the line until the substation equipment was ready. R1-9 cars were used because they only had two motors per car (one per truck), not one motor per axle as on the R16 and later cars.