| Re: Connecting Montauge Street Tunnel to Fulton Line, etc. (600146) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: Connecting Montauge Street Tunnel to Fulton Line, etc. |
|
|
Posted by Wallyhorse on Sun Apr 13 04:01:35 2008, in response to Re: G Train Hearing at City Hall, posted by SMAZ on Sat Apr 12 20:58:27 2008. It would be a very interesting option to have the cut from the Montauge Street line to the Fulton Street line, and it might not be a bad idea to do that anyway, but I still think even with that, I would eventually have the SAS, if extended to Brooklyn go through a new tunnel to get to the Fulton line in Brooklyn (though that doesn't change my opinion that the Nassau connection to the SAS should also be built regardless of whether the segment to Water Street gets built as well). |