Re: LIRR Montauk Branch Trackwork at Bellport |
|
|
Posted by GP38/R42 Chris on Sat Mar 22 23:33:51 2008, in response to LIRR Montauk Branch Trackwork at Bellport, posted by GP38/R42 Chris on Mon Mar 17 21:04:03 2008. I drove by today, and it appears worked stopped when we had all that rain the other day. They only got the siding track done on Tuesday, the running track will have to be done yet. I assume the day they do that they would have to have bustitution. The sign says the crossing will be closed from the 25th to the 28th. The siding track is now almost a foot higher than the running track at the grade crossing, so I assume they will also be raising the running track. |