Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: SAS Phase 4: Water Street/Nassau Street

Posted by Wallyhorse on Sat Feb 2 15:29:12 2008, in response to Re: SAS Phase 4: Water Street/Nassau Street, posted by R160 8818 on Fri Feb 1 19:44:38 2008.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
That area on the Nassau Street line I would only be using the current two tracks in use all the way, not four (obviously, this assumes an M-V merger would be in place by the time this came up).

If necessary, some T trains would terminate at Houston or Chatam Square if there was a Nassau connection, but there no Water Street branch at that point, but I suspect there would be enough room for both the J/Z and T trains along Nassau, with the T continuing to Bay Parkway at ALL TIMES.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]