| Re: SAS Phase 4: Water Street/Nassau Street (563427) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: SAS Phase 4: Water Street/Nassau Street |
|
|
Posted by Wallyhorse on Sat Feb 2 15:29:12 2008, in response to Re: SAS Phase 4: Water Street/Nassau Street, posted by R160 8818 on Fri Feb 1 19:44:38 2008. That area on the Nassau Street line I would only be using the current two tracks in use all the way, not four (obviously, this assumes an M-V merger would be in place by the time this came up).If necessary, some T trains would terminate at Houston or Chatam Square if there was a Nassau connection, but there no Water Street branch at that point, but I suspect there would be enough room for both the J/Z and T trains along Nassau, with the T continuing to Bay Parkway at ALL TIMES. |
(There are no responses to this message.)