Re: ''V'' to Euclid Ave |
|
|
Posted by Stephen Bauman on Tue Jan 29 07:59:34 2008, in response to Re: ''V'' to Euclid Ave, posted by Train Dude on Mon Jan 28 20:29:53 2008. The original speculation was purely hypothetical. However, I was looking at the change from the technicalities of the maintenance standpoint. Currently, scheduled maintenance is driven either by time or mileage. At Pitkin Shop, maintenance is driven by mileage. However, if a dedicated fleet for the (V) line were based at Pitkin Shop, the annual mileage would require scheuling thse cars by time and not miles. This would complicate the schedule matrix.Did you ever estimate the extra cost of operating the V to Euclid? |