| Re: M-V combo (558371) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: M-V combo |
|
|
Posted by SMAZ on Thu Jan 24 01:58:52 2008, in response to Re: M-V combo, posted by Wado MP73 on Wed Jan 23 18:36:55 2008. I would connect it to Nassau St via Park Row after Chatham Sq. It would be south of Canal and Chambers anyway. Construction would be cheapest there because the two SAS tracks can double stack just before plugging in directly into the two Nassau stacks. No fly-over or under needed for the track connections. Any issues with NYPD during construction are easily resolvable. This would be much cheaper then a Water St segment which can be done later anyway while also sending the (T) to Brooklyn. The Wall St crowd would love it, especially the ones residing on the UES. |