Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: New details on East Side Access construction; photos

Posted by Sand Box John on Tue May 1 10:37:25 2007, in response to Re: New details on East Side Access construction; photos, posted by JohnL on Mon Apr 30 11:51:13 2007.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
…and they may still haul the earth out to Queens through the tunnel. It depends on where they are going to dispose of it. I didn’t hear about Manhattan getting any bigger (yet again), so I assume the spoils are going to be landfill elsewhere.

I suppose if the spoils get to Sunnyside yard that one option would be to dump them into rail trucks and take them out over the Hellgate bridge.


Manhattan schist make great concrete and asphalt aggregate. That what the schist spoil was used for that came out of the tunnels of the A Route Red line in Washington. Most of the Upper Connecticut Avenue section spoil/muck went to an asphalt plant in Crofton Maryland where it was made in to asphalt to pave MD US-50 between New Carrollton and Annapolis prior to the road being totally rebuilt.

John in the sand box of Maryland's eastern shore.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]