| Re: A Transit Robert Moses Guy (386535) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: A Transit Robert Moses Guy |
|
|
Posted by GP38/R42 Chris on Tue Feb 13 19:09:02 2007, in response to Re: A Transit Robert Moses Guy, posted by Grand Concourse on Tue Feb 13 18:45:14 2007. The bridge was ready to fall into the East River before they did all those renovations. It's obviously cheaper to repair the existing bridge, and rebuild it, than start from scratch, but obviously, they still have to work with the basic design of the original. The roadways were completely rebuilt, as well as the entire transit infastructure, as well as the walkways. But it's not like when they do that they can reconfigure the way the bridge is layed out, although the walkways, which aren't structural like the roadway infastructure, are completely redesigned, and reinstalled completely differently. |
(There are no responses to this message.)