Re: West London Line & West Coast Main Line (Was: Cockfosters) (370816) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: West London Line & West Coast Main Line (Was: Cockfosters) |
|
Posted by David Fairthorne on Tue Jan 16 14:16:35 2007, in response to Re: West London Line & West Coast Main Line (Was: Cockfosters), posted by Rail Blue on Mon Jan 15 03:51:37 2007. I have noticed that in the off-peak period (midday) there are no trains from Victoria to the following stations:Coulsdon South, Merstham, Earlswood, Salfords (served from London Bridge) Burgess Hill, Hassocks, Preston Park (served from Thameslink via London Bridge) Off-peak most passengers want Victoria rather than London Bridge, and that's one thing that I would like to remedy. The present off-peak service is as follows: 4 tph Victoria to Gatwick only 2 tph Victoria to Brighton fast 1 tph Victoria to Southampton & Eastbourne (splits at Haywards Heath) 1 tph Victoria to Hastings & Littlehampton (splits at Haywards Heath) 1 tph Victoria to Portsmouth & Bognor via Redhill and Horsham (splits at Barnham) 1 tph Victoria to Chichester via Redhill and Horsham 2 tph Thameslink via London Bridge to Brighton fast 2 tph Thameslink via London Bridge to Brighton slow 1 tph London Bridge to Tunbridge Wells via Redhill 1 tph London Bridge to Horsham via Redhill 1 tph Watford to Brighton slow TOTAL 17 tph After killing the Gatwick Express, this is what I suggest off-peak: 2 tph Victoria to Brighton fast 2 tph Victoria to Brighton slow 1 tph Victoria to Eastbourne fast 1 tph Victoria to Eastbourne slow 1 tph Victoria to Littlehampton via Hove fast 1 tph Victoria to Littlehampton via Hove slow 1 tph Victoria to Portsmouth via Redhill and Horsham 1 tph Victoria to Bognor via Redhill and Horsham 2 tph Victoria to Horsham via Redhill 2 tph Thameslink via London Bridge to Brighton fast 2 tph Thameslink via London Bridge to Brighton slow TOTAL 16 tph That would eliminate all splitting, and provide at least 1 tph from Victoria to all stations. All trains would call at East Croydon and Gatwick Airport. I would like to send the Thameslinks via Redhill, to maintain a service from London Bridge to Redhill. Then there would be 8 tph via Redhill and 8 tph via the Quarry line. As for the peak hours, the Brighton line is near capacity, and I would want to know the loadings of individual trains before deciding how better to use the Gatwick Express slots. I would not aim for a regular clock-face service pattern during the peak period. |
![]() |
(There are no responses to this message.)
![]() |
![]() |