| Re: Thameslink 2020 inches closer (355259) | |||
|
|
|||
| Home > SubChat | |||
|
[ Read Responses | Post a New Response | Return to the Index ] |
|
||
Re: Thameslink 2020 inches closer |
|
|
Posted by Rail Blue on Mon Dec 18 07:13:39 2006, in response to Re: Thameslink 2020 inches closer, posted by David Fairthorne on Sun Dec 17 15:09:53 2006. Thameslink passengers can change at London Bridge if necessary, provided that there is a reasonably frequent Thameslink service.Or better still at East Croydon. Only existing Blackfriars routes (Catford loop; Wimbledon & Sutton loop) are to go via the Elephant & Castle. Which still makes rather poor use of the Chatham Lines. I see this as being a far more reliable selection of routes: 4tph Hertford North - Swanley via Herne Hill 2tph Stevenage via Hertford - Swanley via Herne Hill 6tph Welwyn Garden City - Orpington via Herne Hill 2tph St Albans - Guildford via London Bridge and West Croydon 2tph St Albans - East Grinstead via London Bridge 2tph St Albans - Uckfield via London Bridge 2tph Bedford Fast - Tonbridge via London Bridge and Redhill 2tph Bedford Fast - Horsham via London Bridge and Redhill 2tph Bedford Fast - Brighton via London Bridge and Redhill |