Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: Lexington Avenue Line TPH

Posted by stephenk on Mon May 29 16:41:57 2006, in response to Re: Lexington Avenue Line TPH, posted by AMoreira81 on Mon May 29 16:22:04 2006.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Moscow Metro termini usually have one arrival track, and one departure track, and an island platform. Beyond the station are two reversing sidings in between the two main running lines, although only one is usually needed for reversals. Trains are double ended, and thus trains can be reversed in approx 80secs. The trains often only dwell for 20-30secs in the arrival platform as they do not have to be checked that they are empty as thoroughly as in NYC and London.

There are a few exceptions. A few termini have just one reversing siding. Two termini have trains reversing in two platform tracks instead of the sidings. One of these termini handles 34tph with 120m trains. The station has side platforms, and the crossover is unusually nearer the penultimate station that the terminus (although both station are very close together). Trains only dwell for 45secs at this terminus.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]