Thanks.

The MTA has a good description of the station here: http://mta.info/capconstr/esas/elements.html

Some of the highlights from the site:


FACTS AND FIGURES

The largest construction project ever undertaken by the MTA, the ESA project includes:

* A new 8-track terminal at GCT, the first major rail station in Manhattan in over 90 years and the largest mined underground terminal ever built in the U.S.
* 2 deep, underground station caverns mined out of solid rock beneath GCT, each 85.5 feet high, 58.5 feet wide and 1,142 feet long.
* Largest passenger rail terminal built in the U.S. since the late 1930s
* 4 new entrances at GCT
* 7 miles of tunnels along 3.5 route miles
* 50,000 feet of new track in underground tunnels
* 1.225 million cubic yards of excavated soil and rock
* 250,000 cubic yards of poured concrete
* 18,500 tons of reinforcing steel
* Over 300,000 square feet of new passenger concourse and service space within GCT