Re: $6.9 Billion Second Avenue Subway Phase II a ''bargain'' |
|
Posted by qveensboro_plaza on Wed Nov 24 16:47:58 2021, in response to Re: $6.9 Billion Second Avenue Subway Phase II a ''bargain'', posted by Joe V on Wed Nov 24 10:36:33 2021. The existing tunnels above 96th Street are much closer to the street surface because the topography changes. They won't need the long escalator/elevator runs to access the mezzanines.I believe the 116 street station, which was not in the original SAS plans, will be built as an island platform in a section of tunnel that was originally designed to hold a layup track. |