Re: 42nd Street Shuttle Reopens Tuesday 9/7/2021. |
|
Posted by randyo on Thu Sep 9 16:12:16 2021, in response to Re: 42nd Street Shuttle Reopens Tuesday 9/7/2021., posted by murray1575 on Wed Sep 8 10:25:11 2021. As I recall. thr original plans for eliminating one of the shuttle tks was to eliminate tk 4 entirely and used only tks 1 and 3. With the switch connecting tk 1 to 3, both shuttle trains would utilize tk 1 to get to the Lex Line and the connection to the Bway Line eliminated entirely. It was also intended to operate 5 car trains as the total number of cars in shuttle service would be the same as it was with 3 tks in service. The current setup is probably a better idea and with the reconfiguration of theT/Sq end, the movable bridge over tk 4 is no longer necessary simplifying the train swapping operation. |
![]() |