Posted by Chris R16/R2730 on Tue May 4 18:45:39 2021, in response to Re: Nostrand Avenue (A) Station, posted by Spider-Pig on Thu Apr 29 09:56:11 2021. This is why I think the decision to make it an express stop happened after construction began, or, more likely after the final designs were approved. If you wanted to build an express station like Bergen you'd probably have to redesign it, and that would most likely delay construction. The solution they came up with would have saved time and money by simply ramping up the express tracks to the mezzanine level and not changing anything else of the design. |