Re: LIRR to test retrofitting M7s to run off batteries |
|
Posted by pragmatist on Thu Apr 22 15:16:29 2021, in response to Re: LIRR to test retrofitting M7s to run off batteries, posted by AlM on Thu Apr 22 14:58:12 2021. NY is pretty high on the list of hydro power generation. I'm not sure there are too many great opportunities in NY for added pumped storage. Since NY has lofty goals in offshore wind generation, I would expect the focus to be on battery storage. The 2 very large projects I am following are Ravenswood, replacing the peaker plants, and Astoria. Both are at points with existing grid connections, large baseload generation, and available land. In addition Astoria is a proposed "landing site" for one of the offshore projects in the works. |