Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: NJT conducting “Princeton Transitway Study” on Dinky ROW

Posted by Olog-hai on Thu Jan 23 08:38:36 2020, in response to Re: NJT conducting “Princeton Transitway Study” on Dinky ROW, posted by Joe V on Thu Jan 23 08:28:02 2020.

What a nonsensical statement

I'm happy I didn't make it, then.

They need 9 dual-powered locos with that capability for weekday service. They already have 35 such locos. Now they are getting 17 more at $10 million. Ordinary diesel locos cost half that much

Sadly, the tightening number of diesel-electric (normal diesel) locomotive makers drives the cost up too. A new unit would be in the range of $6 million these days.

The way NJT is doing things, they're spending more than enough money to not only electrify to Bay Head but also rebuild the old Philadelphia & Long Branch RR to Seaside Heights (including electrification).

The train covers that in 5 minutes. A bus cannot

It'd be miraculous to find a bus that can achieve a 32˝-mph average speed over 2.7 miles. Consider the acceleration factor.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]