Re: Study of old Rockaway rail line’s revival back on track (1526719) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Study of old Rockaway rail line’s revival back on track |
|
Posted by Fisk Ave Jim on Fri Oct 11 19:45:39 2019, in response to Re: Study of old Rockaway rail line’s revival back on track, posted by randyo on Fri Oct 11 17:25:29 2019. High speed "hard rail" connecting (up to 60mph) crossings exist on many commuter railroads nowadays. Why can't the subway install high speed crossings at certain locations on the QB line that would eliminate the need to slow down exp trains? |