Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track (1526571) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track |
|
Posted by randyo on Thu Oct 10 19:23:12 2019, in response to Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track, posted by 3-9 on Thu Oct 10 00:14:39 2019. An additional lcl service along Qns Blvd would probably not be needed since the only station where service would actually be diminished would be 67 Av since all the stations up to 63 Dr would have the same 2 services and Ctl is accessible by the remaining local service and the express services stopping there. |
![]() |
![]() |
![]() |