Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track (1526447) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track |
|
Posted by qveensboro_plaza on Wed Oct 9 20:33:41 2019, in response to Re: THE STUDY RELEASED-Re: Study of old Rockaway rail line’s revival back on track, posted by G1Ravage on Wed Oct 9 17:59:48 2019. It would be relatively easy to adapt Woodhaven Blvd. station as an express stop, and a convenient transfer point from QB express service to RBB trains. The trackways already exist.As someone here mentioned the other day, the Woodhaven local platforms could then be used as a shuttle terminal for late night operations, though it would be a big expense to install new switches across the line. |