Re: 12-9 on (7) train in East River tunnel (1526404) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 12-9 on (7) train in East River tunnel |
|
Posted by randyo on Wed Oct 9 17:24:04 2019, in response to Re: 12-9 on (7) train in East River tunnel, posted by Train Dude on Tue Oct 8 20:14:15 2019. Actually, on most of the BMT East, the south terminals were physically north of the north terminals. Jamaica, Lefferts (pre IND) and Met are perfect examples. Their designation as south terminals would make more sense if the Eastern Div els had been connected into the BMT’s Bway subway as per dual contract plans. It definitely rings true with the present configuration of the M, the original KK service and the A Line out of Lefferts which was originally BMT East. |
(There are no responses to this message.)