Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion (1525460) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion |
|
Posted by ntrainride on Mon Sep 30 13:31:48 2019, in response to Re: Lower Montauk Branch Passenger Rail Study (Final Report 2018) could cost over $2 Billion, posted by Henry R32 #3730 on Sun Sep 29 19:47:31 2019. uhhg, historically speaking, it did "go to manhattan"...if you go by the connectivity standards of a pre-tunnel or bridge nyc: it connected via ferry service,with the modern riverside development of the astoria/l.i.c./eastern district areas and with those areas becoming a "destination" again direct commuter service could be a valid consideration. |
(There are no responses to this message.)