Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Calling Tunnelrat: Provision for express track flyover at Neptune Avenue on the Culver Line

Posted by randyo on Wed Jun 12 13:28:07 2019, in response to Re: Calling Tunnelrat: Provision for express track flyover at Neptune Avenue on the Culver Line, posted by Bulk88 on Wed Jun 12 05:47:31 2019.

The Lex Av el was built with all side platforms with no space for a center track. As for the Culver, with the exception of the 5th Av el all the Southern Division els were dual contract construction unlike the Eastern els which had to be rebuilt for 3rd tracking and upgrading for steel cars. Even when the Culver was exclusively an el line prior to the opening of the Nassau Cut, it was able to hold steel cars since it was built as part of the dual contracts.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]