Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Metro begins testing automatic door operations on passenger trains

Posted by Sand Box John on Wed Mar 6 07:53:24 2019, in response to Re: Metro begins testing automatic door operations on passenger trains, posted by WMATAGMOAGH on Tue Mar 5 23:31:34 2019.

IIRC NYCT operates trains of a consistent length on each line so that T/Os always stop at the same location. WMATA trains vary by length on 4 of the 6 lines.

And an operator will likely operate trains of different lengths during a shift on those 4 lines.

Never mind the display on the console that defines the train length.

John in the sand box of Maryland's eastern shore.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]